Aswan Tank Alternative Axis

Aswan Tank Alternative Axis

The importance of this development axis is in contributing to the transfer of traffic from the reservoir body to the new axis to maintain the reservoir and extend its life span, in addition to creating new development areas west of the Nile and linking residential areas and industrial and agricultural development areas east and west of the Nile together, creating a large number of job opportunities and facilitating Movement of citizens and the service of development projects. The axis will extend to the west to connect with the Aswan train station for the Light Rail Transit (LRT), while raising the efficiency of the road linking east of the axis and linking to the Aswan Baranis Road. The axis also links the road linking the Aswan-Baranis road to the western desert road (Cairo – Aswan) crossing the Nile River and the western agricultural road (Cairo – Aswan) and the link on the Aswan/Abu Simbel road. Its length is 5.4 km and its width is 29 meters. It has three traffic lanes in each direction. The axis includes 2 bridges and 1 tunnel.


Our mission in this project is to provide some of our testing services with a full interpretation consultancy services as follows:


Our clients in this project are:

How we work

Here is how we work

1

Problem Definition

2

Problem Structure

3

Analysis and Work Plan

4

Analysis Conduction

5

Synthesize Findings

6

Developing Recommendations